A 4-by-4-foot hole has forced part of a bridge to close in Brattleboro, Vermont.
An engineer is expected to inspect the Elliot Street bridge over the Whetstone Brook on Tuesday.
The Brattleboro Reformer reports the bridge was built in 1946 was at the top of the town’s list of bridges that will probably need to be replaced.
A pedestrian walking over the bridge noticed the hole on the deck of the two-lane bridge Monday.
Copyright 2025 Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.
Was this article valuable?
Here are more articles you may enjoy.
Rare Weather Warning Issued as Strong Gusts Fuel Colorado Wildfire Threats
Insurance AI Demo Day Calendar Announced
LA Fires Push Insurers’ 2025 Disaster Losses to $107 Billion
Flooding in California Leads to Soaked Roads, Water Rescues and 1 Death